rovide all labor, materials, and equipment for 2 times per year (once during the month of May and once during the month of October) inspection, training and preventive maintenance service at each of the sites two (2) times per year (once during the month of May and once during the month of October). See the attached equipment location list (Attachment C). The inspection and preventive maintenance shall include work as shown on Attachments A and B. At Hampton and Hooksett Toll Locations the HVAC control systems shall receive a PM during October while the system is in heating mode and the only time the duct work is used in the tunnels. Please note: The new maintenance facility in Newington, which replaces our maintenance facility in Dover, will only require a PM for the 2nd year of the Contract; and the toll facility in Bedford will be converted to All Electronic Tolling by the end of the Contract. 2. The eleven (11) HVAC energy management and control system inspections, training and preventive maintenance shall be done for a lump sum fee as cited in No. 1 above and will be paid for in one lump sum fee of all eleven (11) sites (Attachment C) (one lump sum payment for the May inspection and one lump sum payment for the October inspection).