This project is to install new HVAC systems to condition the Main Building’s dorms, and gym including the Trusty Camp Dorms. The HVAC units at the main building’s dorms will be gas fired heating and DX cooling air rotation units with air cooled condensing units. Gas fired rooftop units will be provided for the Gym. Work will include the electrical distribution upgrades to power the new units. Other work will include installation of concrete pads for the outdoor equipment, refrigeration piping between the air units and condensing units, ductwork, and gas piping to the unit’s furnaces. Split system furnace and coils will also be provided to the Trusty Camp dorms and the Day Room building. A new emergency generator will also be installed at the main building to provide power for the new HVAC system in the event main power goes down.