A. The Work consists of partial roof replacement at the Kemper Center in Kenosha, WI for the County of Kenosha, using a fully-adhered EPDM single-ply roof system. B. The suspected construction of the existing roofing systems is as follows: 1. Wood roof deck (sloped), two (2) layers of 1.5” polyisocyanurate insulation, EPDM singleply membrane, fully-adhered. 2. This information is provided to bidding Contractors as a courtesy and shall be utilized at the discretion of individual contractors. It is not guaranteed nor does it relieve bidders of their responsibility to become familiar with existing conditions per the Owner’s Invitation to Bid. C. The Work includes: 1. Replacement of perimeter sheet metal flashings, as shown in the drawings. 2. Replacement of gutters and downspouts (with new 6” K-style gutters) 3. Miscellaneous carpentry work (wood nailers), as required by the Construction Drawings. 4. Removal of an abandoned pipe penetration and patching of the roof deck, where shown in the Construction Drawings. 5. Temporary disconnection, raising, and reconnection of a gas line that runs across the roof surface, in order to complete the work. a. Contractor shall utilize a licensed mechanical subcontractor for this work. b. Coordinate/schedule with the Owner before turning off any gas supply to the building. D. The Owner will be not responsible for any work associated with this project.