The project consists of complete reconstruction of approximately 3 Village blocks of utility and street reconstruction. The work includes sanitary sewer replacement, watermain replacement, sewer and water laterals, storm sewer replacement, storm laterals, and street reconstruction including select crushed subbase, gravel base, concrete curb & gutter, concrete sidewalks, asphalt pavement and restoration of all disturbed areas. Specically the work includes: 1,135 LF 8-Inch PVC Sanitary Sewer 435 LF 6-Inch PVC Sanitary Sewer Lateral 1,250 LF 8-Inch Class 52 Ductile Iron Watermain 340 LF 1-Inch Copper Water Service 1,135 LF 12-Inch to 18-Inch Reinforced Concrete Pipe Storm Sewer 370 LF 6-Inch PVC Storm Lateral 2,520 LF 6-Inch Underdrain 1,350 CY Crushed Aggregate Base Course 1,825 CY Select Crushed Material 900 TON Asphaltic Pavement 2,520 LF Concrete Curb & Gutter 4,550 SF Concrete Sidewalk and Driveway