The El Cuervo del Sur Phase II Wetland Mitigation Project consists of establishment (creation) and enhancement of wetland resources located along the Los Peñasquitos Creek, within the City of San Diego (City), California. Establishment and enhancement shall be conducted within the designated restoration project area with the intent of offsetting jurisdictional impacts resulting from the City of San Diego’s Stormwater Department’s current and future maintenance projects. The work schedule is defined by a pre-construction phase, installation phase, and 120 calendar day plant establishment period. The pre-construction phase involves a pre-project survey of the restoration project boundary. The Contractor shall also be required to develop a Storm Water Pollution Prevention Plan (SWPPP) and install and maintain erosion control best management practices (BMPs) per the requirements of the SWPPP. Contractor services required of this scope of work include: pre-project demarcation of the restoration project boundary, install and maintain perimeter fencing along the restoration project boundary, cut to grade and remove all exotic and all diseased native vegetation from restoration project area, treat and stockpile all vegetation removed from the restoration project at the project staging areas, remove and dispose of trash and inorganic debris from the restoration project area, conduct regular weed control from the restoration project area for the duration of the contract period, grade areas as depicted on plans, install irrigation system per the construction documents, plant native container plants in rehabilitation areas, and dispose of stockpiled vegetation no later than the completion of the 120 calendar day plant establishment period (or as directed by City)...