Contractor will provide all labor, materials, equipment, and incidentals for the purpose of full width milling and repaving 1.5” (165 #/sy) of 12.5 mm superpave asphalt, thermoplastic striping, loop detectors and replacing pavement markers on specified roads (Approximately 1.13 centerline miles). All deceleration lanes will be included. Temporary paint markings will be required after resurfacing as indicated in section 653 of GDOT specifications to include stop bars, cross walks, railroad crossings, edge lines, lane lines and center lines. The Pop-Up Barrier shall be painted and the loops shall be replaced in the same configuration and size, utilizing materials consistent with the existing installation. All work to be done in accordance with the Georgia Department of Transportation Standard Specifications Construction of Transportation Systems, Current Edition (2021), Supplemental Specifications and Special Provisions for all bid line items to include. Weblink address indicated below. Milling shall be variable depth (1.5” typical) which will require no land disturbing activities for earth shoulder building and grassing items. Milling in some areas may require a 2’ mill head to accomplish milling adequately. Care must be taken to avoid damaging manhole lids, water valves, etc. CONTRACTOR will have discretion on removing any manhole covers and rings and water valve jackets. If removed, temporary covers will be of adequate size and strength to ensure no material enters the voids. After re-installation, a final inspection will be conducted to ensure no obstructions exist. Intersecting roadways will have a smooth transition to the original pavement. Millings shall belong to the County and will be hauled and dumped by the CONTRACTOR to a location no more than ten (10) miles away.