Contractor will provide all labor, materials, equipment, and incidentals for bituminous surface treatment, hot mix overlay and restripe up to approximately 5.40 miles with some isolated patching and leveling on some roads. The roads, mileage, and preferred method of pavement preservation & repair are listed on Appendix A. Striping will consist of traffic paint 652, 5” white edge lines and 5” yellow centerline and skip lines as existing. Temporary paint will be required. Work will consist of a single surface bituminous surface treatment with #89 used for the aggregate, followed by a thin lift overlay using hot mix asphalt. The surface treatment course shall be covered with hot mix prior to reopening the lane to traffic.