The work shall include, but is not limited to the following: 1. Installation of a new Dynamic Message Sign (DMS) on new sign structure at G-10 gantry location. 2. Installation of static regulatory signs at existing gantries including G-12, G-13, G-14 and G- .15. 3. Removal and replacement of mast arm pole gantries for G-12, G-13 and G-14. 4. Removal of G-15 DMS. 5. Installation of new LUS gantries on new mast arm pole structures (G-17, G-18, G-19, G-20 and G-22) with supporting infrastructure and cabinets. 6. Installation of new DMS and LUS on new sign structure north of Eastern Avenue (G-21). 7. Installation of LUS at existing sign structure G-15. 8. Installation of new CCTV camera site north of Lombard Street (C-033A/B). 9. Installation of new conduit and fiber optic cable from CAB-21 near Boston Street/Interstate Avenue to proposed Gantry G-22 and C-033A/B area near Lombard Street. 10. Upgrade of C-035 CCTV cameras, network switches and conversion to networked fiber resources. 11. Replacement and upgrade of C-034 CCTV camera site. 12. Maintain safe and efficient traffic flow through the work zone. 13. Erosion and Sediment Control 14. Coordinating with MDTA and providing support to MDTA for Intelligent Transportation System (ITS) integration and electrical switch over.