1 Mobilization 1 L.S. $ $ 2 Minor Change 1 EST $ 25,000.00 $ 25,000.00 3 Unanticipated Site Improvements 1 F.A. $ 100,000.00 $ 100,000.00 4 Structure Surveying 1 L.S. $ $ 5 CAP Utilization Incentive 1 DOL $ 1,000.00 $ 1,000.00 6 CAP Utilization Penalty 1 CALC $ $ 7 SPCC Plan 1 L.S. $ $ 8 Type B Progress Schedule 1 L.S. $ $ 9 Project Temporary Traffic Control 1 L.S. $ $ 10 Traffic Control Supervisor 1 L.S. $ $ 11 Flaggers 1020 HR. $ $ 12 Other Traffic Control Labor 200 HR. $ $ 13 Construction Signs Class A 260 S.F. $ $ 14 Other Temporary Traffic Control Devices 1 L.S. $ $ 15 Portable Temporary Traffic Control Signal 1 L.S. $ $ 16 Clearing and Grubbing 1 L.S. $ $ 17 Roadside Cleanup 1 F.A. $ 5,000.00 $ 5,000.00 18 Removal of Structures and Obstructions 1 L.S. $ $ 19 Sawcut - Asphalt 250 IN-FT $ $ 20 Roadway Excavation Incl. Haul 3110 C.Y. $ $ 21 Select Borrow Incl. Haul 2150 C.Y. $ $ 22 Structure Excavation Class A Incl. Haul 505 C.Y. $ $