2.1 MEP/FP Engineer Scope of Work. Collectively, all services set forth in this Section 2.1 are referred to as the “MEP/FP Services”. Part A: Programming and Concept Design. Activities to include: Familiarize with the JCRA and the project’s requirements and reestablish the design standards for the building services for the project together with the client, architect, and project team. Assist the architect to refine the massing of the building and its orientation as may be required. Refine engineering concepts as required. Provide space planning and system distribution input to further inform the concept design for the building restoration and renovation. Incorporate the Developer provided MEP/FP systems of the new building for concept design. Identify key schedule implications related to implementing modifications for the conceptual design. Attend of Design meetings/workshops in New York and New Jersey (including teleconference) to discuss overall project objectives. Provide all drawings in AutoCAD or AutoDesk Revit (as applicable), and coordinate with the other design team consultants. Deliverables to include: Concept Design MEP/FP Report Part B: Schematic Design. Following the refined concept design, the project team will proceed to the Schematic Design stage. The documents will formalize the concept design for the project, illustrating the scale and relationships of the project components. Activities to include: Interpret the client’s brief and evaluate the required MEP systems for all building components. Prepare design criteria. Review applicable national, state and local code requirements. Carry out preliminary energy code review. Provide space requirements for mechanical, electrical and plumbing equipment and distribution systems and assist architect and JCRA in preliminary space allocations and coordination with architectural and structural layouts. Provide ongoing consultation and attend design meetings in New York and New Jersey (including teleconference) as required. Deliverables to include: Schematic Design MEP/FP Report Schematic Design MEP/FP Drawings Part C: Design Development. Following approval of the Schematic Design stage documents, the project team will proceed to the Design Development stage. The Respondent shall provide Design Development documents based on the approved Schematic Design documents and updated budget for the cost of the work. Activities to include: Design and develop all mechanical, electrical, plumbing systems, fire suppression/sprinklers and fire alarm as follows: heating, ventilation and air conditioning systems; plumbing systems including domestic water systems and drainage; electrical power distribution; fire alarm and fire suppression; smoke control systems; and emergency/standby power supplies. Develop detailed space requirements for mechanical, electrical and plumbing equipment and distribution systems, and coordination with architectural and structural layouts. Refine and develop schemes based on developed architectural, structural, MEP program needs and JCRA input. Review utility requirements and provide estimated loads in preparation for utility applications and permits. Provide electrical load estimates and assist the architect and client in coordination with the utility requirements. Provide gas load estimates and assist the architect and client in coordination with the gas utility. Coordinate wet utilities with the project civil engineer. Wet utilities shall be picked up by the civil engineer from 5 feet from the building boundary. Coordinate proposed MEP systems with structural systems. Prepare MEP design development drawings including plans, single line diagrams and schedules. Provide ongoing consultation and attend design meetings in New York and New Jersey (including teleconference) as required. Deliverables to include: Performance specifications sections for the applicable systems in the same format used by the architect. Typical detail sketches, in AutoCAD or AutoDesk Revit, hand drawn, for architects to use in preparing the Design Development package. Design Development MEP/FP Drawings and assist design team in preparation and issuance of complete and coordinated Design Development drawings.