• Milling and asphalt paving on Rhodes Drive from Jones Street to Fleming Road (3,770 LF). The work shall include asphalt milling, removal and disposal to a depth of 4” (2.5” below existing gutter elevation), and 2.5” of new 12.5 mm asphalt paving with normal crown section to provide 2% positive drainage from centerline to gutter line. • Milling and asphalt paving on Mill Street from RR Tracks to Second Street (2,680 LF). The work shall include asphalt milling, removal and disposal to a depth of 1.5” below existing gutter elevation, and 1.5” of new 9.5 mm asphalt paving with normal crown section to provide 2% positive drainage from centerline to gutter line. • Milling and asphalt paving on Fountain Street from Mill Street to Campbell Street (675 LF). The work shall include asphalt milling, removal and disposal to a depth of 1.5” below existing gutter elevation, and 1.5” of new 9.5 mm asphalt paving with normal crown section to provide 2% positive drainage from centerline to gutter line. • Asphalt resurfacing of Arnold Street and Ohio Street (1,590 LF). The work shall include 1.5” of 9.5 mm asphalt resurfacing only. • Replace center line striping (5” double yellow paint) and stop bars (24” white thermoplastic) on all streets following asphalt placement.