a. VFR Split System unit. b. VRF outdoor unit. c. VRF multi-port controllers. d. VRF ceiling cassette indoor units. e. VRF ducted indoor units. f. New roof mounted exhaust fan. g. Duct, insulation, and accessories. h. Permit (no fees will assessed), startup, certified test and balance (one report only), warranty. i. Gas piping, bond, engineering fees. j. Electrical disconnects (factory installed or field provided unless specifically required in Mechanical Drawings). k. Energy management systems, or any other automated/digital controls system. l. High voltage wiring (Greater than 24 volts), attic stock, equipment/housekeeping pads or service platforms. m. Roofing, concrete, or structural work (including steel), sloped roof curbs, or isolation rails for roof curbs. n. Attendance of weekly meetings until job is done. o. Demolition, duct pressure testing, duct cleaning, p. Painting, exterior wall openings, interior wall openings, metal building curbs, service platforms. q. Labor or equipment to unload any equipment that is provided by others, if applicable