The City of McHenry intends on constructing the Oakwood Drive Bridge Project consisting of removal of a 5-span CMP culvert bridge and replacement with a triple 5’x12’ concrete box culvert. The project is generally located just south of Oakwood Drive and Meadow Lane. The project and scope of work is based off the previous Phase II design plan performed by Baxter & Woodman. The plans have been submitted to IDOT and are currently pending approval. The Phase I Study, Phase II Plans, Location Map as well as the City’s Federal QBS Policy are available for download from the City website. The professional design services are to be determined during the contract negotiation phase of the selection process. On a preliminary basis, City staff has identified the following scope items that may needed to complete the project: Coordinate and attend kick-off meeting Full-time construction observation Monitor contractor progress, workmanship and adherence to specifications Respond to RFI’s Provide all required IDOT documentation...