Provide all materials and labor necessary to prepare, prime and paint the interior of the Ridgefield Recreation Center gymnasium. Areas included are block walls, metal ceiling, exposed duct work, all interior doors and bleachers. (Excludes metal supports for basketball hoops) Paint to be applied by spray, roller and brush. 1. General Project Scope Location: Ridgefield Recreation Center, 195 Danbury Rd. Ridgefield CT Gym • Metal ceiling to be painted to match existing color and finish • Steel beams to be painted to match existing color and finish • Metal duct work to be painted to match existing color and finish • Concrete walls to be painted white to match existing color and finish • Door trim and painted doors to be painted to match existing color and finish; Bleachers / wood panels inset in concrete wall • Sand all wood surfaces • Apply 2-3 coats, oil based polyurethane varnish to match existing color...