The project includes a lump sum base bid for the following scope of work and items: A new fire alarm system installed at Munson Memorial Library Building for full building coverage of fire alarms, smoke and carbon monoxide detection, signaling equipment (including one red outdoor rated signaling device), and pull stations, where presently there is no fire alarm system. Replace the fire alarm systems at both the Atkins Water Treatment Plant and Boltwood Parking Garage, providing full building coverage of fire alarms, smoke and carbon monoxide detection, signaling equipment, and pull stations, where presently there are failing fire alarm systems. The contractor will be required to furnish and install the necessary equipment to provide secure and reliable point-to-point alarm communication and shall provide all equipment, materials, and labor to design and install said systems. The Fire Alarms shall be compliant with applicable fire safety and electrical code(s), including but not limited to: NFPA 72-2013, NFPA 70, and 527 CMR 1.0. The contractor shall provide all equipment, materials, and labor to protect existing finishes from damage during installation processes. All work shall minimize disturbance to areas beyond the specific work zone and shall ensure surfaces are left clean at the completion of the work and all construction activity debris be properly disposed of...