This project consists of the Contractor providing all labor, equipment, materials, supplies, insurance, etc. necessary to renovate two (2) day-use comfort stations. This project includes the following: Exterior Renovations for Each Restroom: NOTE: The quantities in this specification are for one (1) restroom. When calculating for work and /or supplies you must double the quantity to supply two (2) identical restrooms. a. Remove and properly dispose of existing metal roofing (approximately 1,100 SF), felt underlayment, flashing, drip edge and all associated appurtenances down to bare roof purlins. b. Inspect roof purlins and replace any deteriorated wood as directed by the DNR Project Engineer and DGS Inspector on a unit price basis, (Unit Price #1). c. Fully remove four (4) skylight domes and completely close the openings to create a flush slope that matches the surrounding roof sheathing. d. Install four (4) new solar tubes, two (2) over each bathroom. e. Provide and install metal roof, felt underlayment, flashing, drip edge, etc. to roof of approximately 1,100 SF. f. Remove and replace all wood fascia, approximately 50 LF. g. Remove and replace all wood rake board and wrap, approximately 120 LF. h. Provide and install a new complete gutter system along the front and rear, approximately 50 LF. Two new downspouts and concrete splash blocks shall be included.