Electrical Annual Preventative Maintenance Electrical Tests 5KV Switchgear Substation and 5KV Generator breakers Breakers shall be removed from the designated cubicle Electrical cabinets shall be cleaned Breakers shall be visually inspected Breakers shall be partially dismantled Breakers shall be cleaned and lubed per Manufacturers’ specifications Breakers shall be Electrically tested (charge, closed, tripped, Megger, High Pot Contact Resistance) Breakers shall be re-installed in the original destination Main Electrical switchgear Room at the Membrane Building Breakers shall be removed from the designated cubicle Electrical cabinets shall be cleaned Breakers shall be visually inspected Breakers shall be partially dismantled Breakers shall be cleaned and lubed per Manufacturers’ specifications Breakers shall be Electrically tested (charge, closed, tripped, Megger) Breakers shall be re-installed in the original destination All Breaker Programmers shall be Solid State Tested