0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 080060 LEVEL 2 CRITICAL PATH METHOD SCHEDULE LS LUMP SUM 0003 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 440 0004 090205 DISPUTE RESOLUTION BOARD ON-SITE MEETING EA 9 0005 090210 HOURLY OFF-SITE DISPUTE-RESOLUTIONBOARD-RELATED TASKS HR 10 0006 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0007 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0008 120165 CHANNELIZER (SURFACE MOUNTED) EA 27 0009 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 440 0010 120320 TEMPORARY BARRIER SYSTEM LF 10,200 0011 014105 ALTERNATIVE TEMPORARY CRASH CUSHION TL-3 EA 120 0012 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 2 0013 130100 JOB SITE MANAGEMENT LS LUMP SUM 0014 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0015 130321 STORMWATER SAMPLING AND ANALYSIS DAY EA 2 0016 130331 STORMWATER ANNUAL REPORT EA 4 0017 130560 TEMPORARY SOIL BINDER SQYD 2,520 0018 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 10 0019 130640 TEMPORARY FIBER ROLL LF 15,000 0020 130710 TEMPORARY CONSTRUCTION ENTRANCE EA 4