1st Floor File Room • Remove a section of ceiling grid for install of new bypass damper • Remove section of bypass duct (square galvanized) and dispose offsite • Install a new end cap on each end of the ductwork where duct was removed and seal with duct sealant • Install a new 14” bypass damper (as specified above) where duct was removed • Install a 14” collar on each end cap and install flex from new end caps to new 14” round bypass damper • Seal all new flex connections with tape, fab, staples and mastic to ensure a tight seal • Reinstall ceiling grid and ceiling tiles • Provide a Trane BAS Technician to ensure proper communication of wireless controls & operation through Trane front-end Building Automation System • Clean-up of all materials & debris 1st Floor Over Cubicle • Remove a section of ceiling grid for install of new bypass damper • Remove section of bypass duct (square galvanized) and dispose offsite • Install a new end cap on each end of the ductwork where duct was removed and seal with duct sealant • Install a new 14” bypass damper (as specified above) where duct was removed • Install a 14” collar on each end cap and install flex from new end caps to new 14” round bypass damper • Seal all new flex connections with tape, fab, staples and mastic to ensure a tight seal • Reinstall ceiling grid and ceiling tiles • Provide a Trane BAS Technician to ensure proper communication of wireless controls & operation through Trane front-end Building Automation System • Clean-up of all materials & debris 2nd Floor File Room • Remove part of ceiling for access to existing bypass damper located in between the supply and return plenum • Demo existing bypass damper in between duct and dispose offsite • Install a 14” collar in supply and return plenum and install galvanized round pipe and connect to new bypass damper that will be installed in between the plenums • Insulate new bypass damper and new piping and seal with silver tape, fab, staples and mastic to ensure a tight seal • Reinstall ceiling grid and ceiling tiles that were removed for new bypass install • Provide a Trane BAS Technician to ensure proper communication of wireless controls & operation through Trane front-end Building Automation System • Clean-up of all materials & debris 2nd Floor Over Cubicle 2C-20 • Remove a section of ceiling grid for install of new bypass damper • Remove section of bypass duct (square galvanized) and dispose offsite • Install a new end cap on each end of the ductwork where duct was removed and seal with duct sealant • Install a new 14” bypass damper (as specified above) where duct was removed • Install a 14” collar on each end cap and install flex from new end caps to new 14” round bypass damper • Seal all new flex connections with tape, fab, staples and mastic to ensure a tight seal • Reinstall ceiling grid and ceiling tiles • Provide a Trane BAS Technician to ensure proper communication of wireless controls & operation through Trane front-end Building Automation System • Clean-up of all materials & debris