GROUP I – Asphaltic Concrete Superpave Asphaltic Concrete Included in the price of asphalt will be cost of all work and materials associated with the following items: 105 Quality Control; 300 Tack, Prime and Sand. (Section 334). Basis of payment shall be under: Items No. 334-1-xx Superpave Asphaltic Concrete - per ton. Asphalt Concrete Friction Course Included in the price of asphalt will be cost of all work and materials associated with the following items: 105 Quality Control; 300 Tack, Prime and Sand. (Section 337). Basis of payment shall be under: Items No. 337-7-xx Asphalt Concrete Friction Course - per ton. Miscellaneous Asphalt Pavement Included in the price of miscellaneous asphalt will be the cost of all work and materials associated with the following items: 105 Quality Control. (Section 339). Basis of payment shall be under: Item No. 339-1 Miscellaneous Asphalt Pavement - per ton. me and Tack Coats for Base Courses The pay item for Prime and Sand shall be a maintenance pay item only. Basis of payment shall be per square yard. The application of Prime and Sand or Tack on paving projects shall be included in the bid price of the asphalt under the 334 and 337 pay items. (Section 916). Basis of payment shall be under: Item No. 2-1 Prime and Sand - per square yard. Asphalt Membrane Interlayer The pay item for Asphalt Membrane Interlayer includes cost of all work, materials, equipment, and incidentals associated with the application of asphalt binder material covered with a single application of aggregate, as specified in Section 341. Basis of payment shall be under: Item No. 341-1-1 Asphalt Membrane Interlayer - per square yard.