GUARDRAIL REMOVAL Effective: August 20, 1990 Revised: April 10, 2014 This work shall be done in accordance with Section 632 of the Standard Specifications except that all removed guardrail will become the property of the Contractor. This work will be paid for at the contract unit price per Foot for GUARDRAIL REMOVAL, measured from center-to-center of end posts. PCC AUTOMATIC BATCHING EQUIPMENT Effective: January 1, 2015 Revised: January 31, 2023 Portland cement concrete provided shall be produced from batch plants that conform to the requirements of Article 1103.03 (a) and (b) of the Standard Specifications for Road and Bridge Construction. Semi-automatic batching will not be allowed. Plants shall have computerized batching interfaced with a printer. IDOT Producer Number, IDOT Design Number, Concrete Material Code, batch weights, aggregate mixtures, water added, amount of each admixture or additive, and percent variance from design shall be printed for each batch. Tickets shall state the actual water-cement ratio as batched, and the amount of water that can be added to the batch without exceeding the maximum water-cement ratio. Truck delivery tickets are still required as per Article 1020.11(a)(7) of the Standard Specifications.