Clean-up and Public Safety: The work site shall be maintained in a clean condition, free of hazards to the work force and the public, all in conformance with the requirements of Article 107 of the Standard Specifications. Special care shall be taken to assure that electrical systems are not left in an exposed or otherwise hazardous condition. All electrical boxes, cabinets, pole handholes, etc., which contain wiring, either energized or non-energized, shall be closed or shall have their covers in place and shall be locked when possible, during off-work hours. Responsibility for Operating Lighting: The scope of work shall include the assumption of responsibility for the continuing operation of existing, temporary or other lighting systems affected by the work as may be specified elsewhere herein. Existing lighting systems, when depicted on the Plans, are intended only to indicate the general nature of the systems involved and shall not be construed as an exact representation of the field conditions. It remains the Contractor's responsibility to visit the site to confirm and ascertain the exact nature of systems to be maintained. Cooperation Between Contractors: The Contractor shall perform the work in full compliance with Article 105.08 of the Standard Specifications. This shall especially extend to any affected maintenance forces work and electrical systems work adjacent to the specific project limits.