A. Scope of demolition and removal work is shown on drawings and as specified in Section 02 4119. B. Scope of alterations work is shown on drawings and/or as specified herein. C. Site modifications: None. D. Architectural modifications: 1. Renovate approximately 2,895 square feet of the second floor to create offices for the URI Office of Capital Projects (OCP) with the conversion of Rooms 202, 203, 204 and 205 into the OCP office suite. 2. Renovation of existing Breakroom 213. E. Plumbing modifications: 1. Modifications to plumbing systems at Breakroom 213. F. Mechanical modifications: 1. Modifications to mechanical systems at work area. E. Electrical modifications: 1. Modifications to electrical systems at work area.