0001 070030 LEAD COMPLIANCE PLAN LS LUMP SUM 0002 090100 TIME-RELATED OVERHEAD (WDAY) WDAY 200 0003 090200 DISPUTE RESOLUTION ADVISOR ON-SITE MEETING EA 4 0004 090207 HOURLY OFF-SITE DISPUTE-RESOLUTIONADVISOR-RELATED TASKS HR 20 0005 120090 CONSTRUCTION AREA SIGNS LS LUMP SUM 0006 120100 TRAFFIC CONTROL SYSTEM LS LUMP SUM 0007 120120 TYPE III BARRICADE EA 21 0008 120159 TEMPORARY TRAFFIC STRIPE (PAINT) LF 32,600 0009 120165 CHANNELIZER (SURFACE MOUNTED) EA 470 0010 120207 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY 400 0011 120300 TEMPORARY PAVEMENT MARKER EA 670 0012 120320 TEMPORARY BARRIER SYSTEM LF 880 0013 124000 TEMPORARY PEDESTRIAN ACCESS ROUTE LS LUMP SUM 0014 128652 PORTABLE CHANGEABLE MESSAGE SIGN (LS) LS LUMP SUM 0015 129105 TEMPORARY CRASH CUSHION TL-2 EA 1 0016 129152 TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM EA 2 0017 130100 JOB SITE MANAGEMENT LS LUMP SUM 0018 130301 STORMWATER POLLUTION PREVENTION PLAN LS LUMP SUM 0019 130530 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX) SQYD 4,010 0020 130620 TEMPORARY DRAINAGE INLET PROTECTION EA 67