A. Plant the processed shell purchased and stockpiled by the NJDEP or other contractor in locations identified by NJDEP; B. Plant only on sites once they have been physically marked (e.g., flagged or buoyed) by NJDEP; C. Plant shell on-site by the Global Positioning System (GPS) chartplotter positioning of that vessel within the flagged area; D. Broadcast a thin layer ofshell cast overboard with a raw water pump when planting; E. Equip all shell planting vessels with a GPS chartplotter and an operable back-up electronic positioning system; F. Equip all vessels with an operable electronic depth sounder; G. Equip all planting vessels and/or barges with a minimum six (6) inch diameter high pressure raw water pump; and H. Ensure vessels and barges are maneuverable and of shallow enough draft to facilitate planting a minimum of 20,000 bushels per trip in eight (8) feet Mean Low Water (MLW).