• CONTRACT 1A: FORCEMAINS o Construct approximately 8,700 linear feet (LF) of 12-inch diameter force main, which includes two jack and bores and one horizontal directional drill, from the proposed Holly Ridge Pump Station to existing 12-inch force main at the intersection of Morris Landing Road and Holly Ridge Road, as shown on the Drawings. o Construct approximately 2,350 LF of 18-inch diameter force main, which includes one jack and bore, from the proposed Summerhouse Pump Station to the temporary plug location on Holly Ridge Road, as shown on the Drawings. o Construct approximately 1,600 LF of 8-inch diameter treated effluent force main, including one jack and bore, from the existing Summerhouse Reclaimed Pump Station to the existing Holly Ridge Spray Field Storage Pond, as shown on the Drawings. • CONTRACT 1B: PUMP STATIONS o Construct Holly Ridge Pump Station at the Existing Holly Ridge Wastewater Treatment Plant site. Pump station to include two (2) new submersible pumps (and space for a third), monorail pump lift crane under roof, back-up diesel pump, emergency generator, electrical building with electrical and telemetry equipment, and associated piping, appurtenances, roads, and site work. o Construct Summerhouse Pump Station at the existing Summerhouse Water Reclamation Facility site. Pump station to include submersible wet well with three submersible pumps (and space for a fourth), valve vault, monorail pump lift crane under roof, back-up diesel pump, emergency generator, electrical building with electrical and telemetry equipment, and associated piping, appurtenances, roads, and site work. o Replace existing Reclaimed Water Pumps with new Reclaimed Water Pumps and associated equipment.