The Project is a new construction of a Elementary School and (5) Baseball fields The new elementary school is anticipated to be a two (2) story elementary school of approximately 90,000 square feet, with classrooms, offices, science lab, art, music, media center, kitchen, cafeteria and PE gym and (5) Baseball Fields to be constructed on an approximately 25 acre site for approximately 700 students The selected firm shall perform Pre-Construction and Construction Phase Services as set forth in modified AIA Documents A-133 (2019) Agreement between Owner and Construction Manager as Constructor with a Guaranteed Maximum Price (GMP) and A-201 (2017) General Conditions. The firm must have appropriate bonding and insurance capacity to be considered for selection. The selected firm shall provide all services as a representative of the Owner from the conceptual stage through planning, design, construction, occupation, and contract closeout. The scope of work may include the following tasks: Pre-Construction Services shall include but are not limited to the following: a. Participate in design team meetings as required to facilitate the design process. b. Evaluate construction documents for constructability, maintainability, potential problems, errors and compliance with the construction budget. c. Develop a construction schedule, coordinating activities to accomplish the completion of the project by the earliest date possible within the stated cost limitation. d. Provide cost estimating, cost management, value analysis, and value engineering. e. Provide cost estimating of individual construction packages. Develop a construction budget to be maintained throughout the design and construction to confirm with the Guaranteed Maximum Price for the Project. g. Guaranteed Maximum Price: At an appropriate point in the project and subject to contractual negotiations, the CM at-Risk shall propose to the District a guaranteed maximum price backed by a surety bond. After agreement with the District, the project shall be constructed within this Guaranteed Maximum Price. To the extent professionally responsible, the firm will overlap the Design Development and Construction Phases when components are conducive to early construction starts, reflecting such in the project schedule.