The 2025 PCC Reconstruction Program – SE 8th Street project includes pavement reconstruction and minor utility improvements along SE 8th Street from just west of SE Sharon Drive to just west of SE Trilein Drive in the City of Ankeny. The construction improvements include the slip-form paving of approximately 4,075 SY of 8” thick PCC Class C-SUD street pavement, approximately 600 SY of 7” thick PCC Class C-SUD intersection handwork, and 525 SY of 6” thick PCC Class C residential driveways. Other associated improvements include Class 10 excavation, subgrade preparation, modified subbase placement, subdrain installation, removal and replacement of storm sewer structures and pipes, minor and major adjustments to existing storm sewer and sanitary sewer structures, removal and replacement of water valves, ADA compliant sidewalk ramps, temporary surface restoration, compost amendment of existing topsoil, permanent surface restoration, temporary traffic control, mobilization, and miscellaneous associated work necessary to complete the project.