SCOPE OF WORK A. General: Provide all materials, equipment and labor necessary to furnish and install BMPs and required maintenance. B. The Contractor shall provide erosion and sediment control measures to the following activities, but not limited to: 1. Cut and fill operations. 2. Temporary stockpiles. 3. Vehicle and equipment storage, maintenance and fueling operations. 4. Concrete, plaster, mortar and paint disposal. 5. Dust control. 6. Tracking of dirt, mud on off-site streets. 7. Pipe flushing. 8. Appropriate Erosion Controls PART 2 - PRODUCTS 2.01 MATERIALS A. Straw Wattles: Shall be new manufactured straw roles in compliance with state requirements for sediment control. B. Filter Bag: Shall be as required by local jurisdiction. PART 3 - EXECUTION 3.01 INSTALLATION A. Straw Wattles: Shall be installed as required. B. Filter Bags: Shall be installed as required by manufactures requirements. 3.02 MAINTENANCE AND REMOVAL A. General: Maintain and repair existing and new erosion control facilities throughout the construction period. Remove silt build up at straw wattles and/or silt fences as needed. Repair damage to earth slopes and banks. Erosion control measures shall be left in place until final paving and landscaping are complete. B. Monitoring: Contractor shall provide all site monitoring and recommendations to meet current NPDES requirements during construction. C. Cleaning: Keep area clean of debris.