1 1100050 HOUR 1,000.000 TRAINING 2 2000100 HOUR 10.000 SURVEY CREW 3 2020120 SQFT 221,415.000 REMOVAL OF PORTION OF BRIDGE DECK 4 2020160 LINFT 873.000 REMOVAL OF EXPANSION JOINTS 5 2020345 SQYD 2,159.000 REMOVE CONCRETE SURFACE (COLD MILLING) 6 2020400 LINFT 131.000 REMOVAL OF CONCRETE BARRIER RAIL 7 2020475 LINFT 67.000 REMOVAL OF GUARDRAIL 8 2020545 LINFT 60.000 REMOVAL OF SOUND WALL 9 2020895 EACH 383.000 REMOVE LIGHTING FIXTURES 10 2020925 EACH 11.000 REMOVAL OF PULL BOX 11 2020935 CUYD 124.700 REMOVAL OF COMPOSITE SURFACE 12 2020985 SQYD 268,626.290 REMOVAL OF BITUMINOUS SURFACE (SPECIAL) 13 2020990 SQYD 137,740.570 REMOVAL OF BITUMINOUS SURFACE (COLD MILLING) 14 2020995 SQYD 2,955.360 REMOVAL OF BITUMINOUS SURFACE (MISCELLANEOUS COLD MILLING) 15 2060110 CUYD 38.000 STRUCTURE EXCAVATION