The Work to be completed for the SWA WTP Generator Installation is described briefly as follows: Furnish all labor, materials, tools, testing, and minor equipment required to install one new 600kW and one new 750kW generator, each with an automatic transfer switch (ATS) per the full set of Construction Drawings, Contract Documents, and Technical Specifications. Work entails all labor, tools, miscellaneous parts/materials/equipment, preparing the site for generator installation, construction of reinforced concrete slabs, and miscellaneous erosion/site stabilization work, as well as all costs associated with submitting and obtaining a building permit. Generators will be procured and purchased through a separate RFP process.