Removal, disposal, and replacement of the synthetic turf athletic field surface at Garber Field including, but not limited to: a. Mobilization and preparation of the site, including site security and protection of Work and installation of erosion and sedimentation control measures; b. Protection of utilities to remain; c. Surveying, staking, construction layout; d. Construction, materials, and performance testing; e. Selective site demolition and disposal including removal and disposal/recycling of existing synthetic turf and infill; f. Earthwork and laser grading stone base; g. Installation of shock pad and synthetic turf materials; h. Site restoration; i. Site cleanup; j. Project closeout, including providing as-built survey(s) and record drawings upon completion of construction.