• Construction of approximately 9,483 linear feet of sanitary sewer gravity main Vitrified Clay Pipe (VCP) by open-cut (which includes 4,777 linear feet of 8-inch pipe for residential parcels and 418 linear feet of 8-inch pipe for the non-residential parcels in the Old Florin Town community, and 4,288 linear feet of 8-inch pipe for the residential parcels in the Linda Manor community). • Construction of approximately 55 linear feet of 21-inch RCP Class III or Vitrified Clay Jacking Pipe (VCP-J) casing by bore and jack for the Old Florin Town community. • Construction of approximately 94 linear feet of 16-inch SDR 14 C900 Polyvinyl Chloride (PVC) and 6-inch (PVC) Air Jumper by open cut for the Linda Manor community. • Construction of approximately 12,512 linear feet of 4-inch and 6-inch High Density Polyethylene (HDPE) service laterals (which includes 6,838 linear feet of 4-inch to 6-inch HDPE pipe for residential parcels and 1,197 linear feet of 6-inch HDPE pipe for non-residential parcels in the Old Florin Town community and 4,477 linear feet of 4-inch HDPE pipe for the residential parcels in the Linda Manor community).