4.1.1 Demolition • Successful contractor will be responsible for all demolition of the existing piers. • All pilings will be removed and disposed of. • All Framing, decking, and railing will be removed and disposed of. • Vendors are advised that Knox County policy does not allow vendors to utilize on-site trash bins paid for by the County. Vendors are responsible for removing and disposing of all debris associated with the work to be performed under this Contract. 4.1.2 Manufacturing • Large Fishing Pier (East) o One (1) 8-foot by 80-foot Aluminum Gangway Hinged to existing concrete bulkhead Aluminum Construction Aluminum Decking Intermittent Handrail Supplemental flotation at bottom of gangway o Eight (8) 8’ x 25’ floating docks Composite Decking attached using the TimberStrong, or equal, hidden deck fastening system. ADA fishing railing around perimeter of docks o Two (2) 8’ x 16’ floating docks o One (1) Transition ramp from main dock to kayak dock. o One (1) Clip-A-Launch o One (1) Adaptive Boarding Kit Boarding bench with pullout seat Overhead grab bar § Roll cage with hand assist straps Instructional sign o Six (6) Piling Guides o Six (6) Pilings 4.1.3 Installation The successful contractor will be responsible for the complete installation of the fishing pier. Installation will not be considered complete until a final written acceptance is executed by the County. Contractor shall be responsible for insuring that all installation is in accordance with all applicable codes, ordinances, rules and regulations.