1. Site Work - New turf field with rubber walking perimeter walking path, asphalt, and concrete pavement replacement, basketball court striping, new ornamental metal fencing and gates. 2. Addition - Full renovation of existing addition and vestibule connecting to main building. This consists of replacement of all interior finishes and fixtures, including but not limited to unit ventilators, exhaust fans, electrical lighting controls/outlets, plumbing fixtures, supply lines, architectural finishes, doors, frames, hardware. Exterior includes replacement of roof, gutters, downspouts, exterior cladding, windows, storefront systems, metal paneling. 3. Main building - Scope consists of full fire alarm replacement (inclusive of addition), replacement of existing water lines triggering ceiling removal and replacement, and insulating existing hot recirculation lines above ceilings.