MASONRY --REPOINT 1 SF; Mortar missing or deteriorated along foundation Side A,B,C,D. Has had previous water damage to basement which Project Now has fixed.Add to protection of water infiltration. Remove all loose material with clear water. Saturate joints with water and repoint in 1/2" lifts using portland cement mortar. Reinstall any flashing, tool concave joints and clean block face. SIDING--VINYL 19 SQ; Hang vinyl siding including all cornice, corner, door and window trim to enclose existing fiberboard siding after replacing all deteriorated exterior building components. Build out and wrap in aluminum all 22 exterior openings. (Side A:2 windows 1 door 1st floor/2 windows 2nd floor Side B:4 windows 2nd floor Side C:2 window 2 doors 1st floor/2 windows 2nd floor Side D:3 windows 1st floor/2 windows second floor)Wrap home with vapor/ infiltration barrier taping all seams and overlaps and apply owner's choice of siding color, exposure and texture with 50 year warranty.