The scope of work will generally include (without limitation) preconstruction service (by the Owner’s CM) assistance and evaluation of site, budgeting, proposal of alternate systems, design review, constructability review, bidding, value engineering (if required), scheduling assistance, production of conformance drawings, purchase order assistance and construction administration in as many packages or scenarios as is expeditious or beneficial to RSA, including without limitation, for the items set forth herein, which are generally subject to change but provided for your reference in determining your fees and assembly of the proposed team required to respond to this RFP, for the following items: • New cast in place concrete (with architectural precast veneer) parking facility to accommodate approximately 400 cars on two levels. • New energy plant to provide chilled water and hot water for the Alabama Capital HVAC systems. • Additional items of work may be encountered during the performance of the services described herein. • Note that the expectation is that the construction delivery will be in multiple packages to multiple prime contractors. • The contract form will be a RSA standard AE Agreement with RSA terms and conditions as a master contract, with individual project components as described herein issued as individual work orders.