The Town of Chino Valley (the “Town”) owns and operates the Chino Valley Water Reclamation Facility for treatment of municipal wastewater generated within a portion of Town limits. Certain flow equalization and process improvements are required for the facility to treat the current influent flow and loading conditions to the existing limits and recover its rated capacity. The Town is issuing this Request For Qualifications (this “RFQ”) seeking statements of qualifications (“SOQ”) from qualified, licensed firms (“Vendors”) interested in providing professional construction manager at risk construction services for design phase review and construction of the Chino Valley Water Reclamation Facility Improvements Project (the “Services”), as more particularly described in the sample Construction Manager at Risk Agreement included in Section B of this RFQ (the “Scope of Work”). 30% conceptual design plans are included in Section C of this RFQ. In accordance with the Town’s Procurement Policy, the Town will accept sealed SOQ for the Services specified in the Scope of Work.