Project Description: The scope of this project includes the design, permitting, and construction of two separate 16-inch diameter water main interconnections in the Bayshore area to provide public drinking water access to adjacent, unserved properties and neighborhoods that are impacted by PFAS. The general anticipated alignments of both water mains are shown in Exhibit A (attached) and described as follows: • One 16-inch diameter water main will extend approximately 2 miles along Market St. and Bayshore Dr. The segment along Market St. will include connections to the existing 16-inch water mains at the intersections of Wendover Ln. (Connection Point A) and Torchwood Blvd. (Connection Point B). This water main will continue along Bayshore Dr. from the Market St. intersection and to Bayfield Dr. to connect to the Page | 3 existing 8-inch water main (Connection Point C). Connection Points are shown in Exhibit A (attached). • The other 16-inch diameter water main will be installed along Furtado Drive and connect to the existing 12-inch main along Porter’s Neck Rd. and the 8-inch diameter water mains just west of Furtado Dr. See Connection Points D and E in Exhibit A.