MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 25.000 SY REMOVAL OF EXIST. GUARDRAIL 3,275.000 LF BORROW EXCAVATION 8,040.000 CY EXCAVATION FOR SHOULDER PAVING 1,336.000 STA HAULING OF EXCAVATED SHOULDER MATERIAL 1,336.000 STA MAINTENANCE STONE 569.750 TON HMA SHOULDER WIDENING COURSE 5,105.995 TON LIQUID ASPHALT BINDER PG64-22 1,998.485 TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 19,425.000 SY FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 22,650.000 SY FULL DEPTH ASPH. PAV. PATCHING 12"UNIF 4,500.000 SY MILLING EXISTING ASPHALT PAVEMENT 1.0" 25,715.000 SY MILLING EXISTING ASPHALT PAVEMENT 1.75" 129,585.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 51,475.000 SY MILLING EXISTING ASPHALT PAVEMENT 3.0" 29,760.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 11,250.000 SY ASPHALT SURFACE COURSE TYPE B 5,216.826 TON ASPHALT SURFACE COURSE TYPE C 21,915.759 TON DRIVEWAY PAVING-SURFACE TYPE B 7.875 TON DRIVEWAY PAVING-SURFACE TYPE C 1,211.875 TON TRAFFIC CONTROL 1.000 LS PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 4,634.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 12,430.000 LF 6" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 744.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 229,835.000 LF 6" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 210,060.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 1,820.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 2,365.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 14.000 EA