MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 663.990 SY UNCLASSIFIED EXCAVATION 98.000 CY BORROW EXCAVATION 1,258.000 CY EXCAVATION FOR SHOULDER PAVING 651.100 STA HAULING OF EXCAVATED SHOULDER MATERIAL 651.100 STA MAINTENANCE STONE 35.250 TON HMA SHOULDER WIDENING COURSE 4,337.080 TON LIQUID ASPHALT BINDER PG64-22 2,698.445 TON FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 3,525.000 SY MILLING EXISTING ASPHALT PAVEMENT 2.0" 294,510.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 23,455.000 SY ASPHALT INTERMEDIATE COURSE TYPE B 11,454.907 TON ASPHALT SURFACE COURSE TYPE B 33,287.866 TON DRIVEWAY PAVING-SURFACE TYPE C 511.000 TON TRAFFIC CONTROL 1.000 LS PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,220.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 49,690.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 270,700.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 23,510.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 5,080.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 223.000 EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 75.000 EA WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 8.000 EA WHITE LANE DROP ARROW (LEFT OR RIGHT)-FAST DRY PAINT 18.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 26,960.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 267,200.000 LF 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 5,200.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 16,430.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 78,080.000 LF 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 8,710.000 LF 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 90.000 LF