MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2,938.000 SY REMOVAL OF EXIST. GUARDRAIL 200.000 LF UNCLASSIFIED EXCAVATION 678.000 CY BORROW EXCAVATION 481.000 CY EXCAVATION FOR SHOULDER PAVING 1,820.000 STA HAULING OF EXCAVATED SHOULDER MATERIAL 481.000 STA MAINTENANCE STONE 70.000 TON HMA SHOULDER WIDENING COURSE 3,204.000 TON LIQUID ASPHALT BINDER PG64-22 621.000 TON FULL DEPTH ASPH. PAV. PATCHING 10"UNIF 6,941.000 SY MILLING EXISTING ASPHALT PAVEMENT 1.75" 70,791.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 3,378.000 SY ASPHALT SURFACE COURSE TYPE B 8,169.000 TON DRIVEWAY PAVING-SURFACE TYPE D 500.000 TON TRAFFIC CONTROL 1.000 LS PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 976.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 2,745.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 190,080.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,950.000 LF WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 12.000 EA WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 6.000 EA RAILROAD CROSSING SYMBOLS - FAST DRY PAINT 6.000 EA 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 19,500.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 142,500.000 LF 6" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 915.000 LF 6" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 63,360.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 650.000 LF WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 4.000 EA WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 2.000 EA RAILROAD CROSSING SYMBOLS - THERMOPLASTIC - 125 MIL. 2.000 EA 6" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 6,500.000 LF