MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 2.000 SY REMOVAL OF EXIST. GUARDRAIL 280.000 LF UNCLASSIFIED EXCAVATION 514.000 CY BORROW EXCAVATION 478.000 CY MAINTENANCE STONE 196.000 TON CEMENT MODIFIED RECYCLED BASE (8" UNIF)-CURING METHOD B 75,388.000 SY PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 1,922.000 TON LIQUID ASPHALT BINDER PG64-22 714.244 TON FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 30.000 SY FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 1,750.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 5,100.000 SY ASPHALT SURFACE COURSE TYPE C 9,035.330 TON ASPHALT SURFACE COURSE TYPE E 1,355.200 TON DRIVEWAY PAVING-SURFACE TYPE C 903.625 TON ASPHALT SURFACE TREAT(SINGLE TREAt TYPE A) 75,388.000 SY TRAFFIC CONTROL 1.000 LS PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 730.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 615.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 211,623.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 1,128.000 LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,575.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 185,868.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 615.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 78,680.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 531.000 LF 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 4,575.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 52,920.000 LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 520.000 EA MILLED-IN RUMBLE STRIP 4.840 MI PREMASH THRIEBEAM BRIDGE CONN TBBC3 4.000 EA PREMASH TYPE T TL3 LEADING 50' 4.000 EA