MOBILIZATION 1.000 LS BONDS AND INSURANCE 1.000 LS REMOVAL & DISPOSAL OF EXISTING PAVEMENT 85.000 SY REMOVAL OF EXIST. GUARDRAIL 110.000 LF BORROW EXCAVATION 812.000 CY EXCAVATION FOR SHOULDER PAVING 238.656 STA HAULING OF EXCAVATED SHOULDER MATERIAL 238.656 STA MAINTENANCE STONE 16.550 TON HMA SHOULDER WIDENING COURSE 1,988.800 TON LIQUID ASPHALT BINDER PG64-22 290.569 TON ARAMID FIBER 265.000 LB FULL DEPTH ASPH. PAV. PATCHING 4" UNIF. 1,445.000 SY FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 210.000 SY MILLING EXISTING ASPHALT PAVEMENT 1.5" 3,100.000 SY MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 2,800.000 SY ASPHALT SURFACE COURSE TYPE C 958.044 TON ASPHALT SURFACE COURSE TYPE D 1,674.940 TON DRIVEWAY PAVING-SURFACE TYPE D 336.875 TON ASPHALT SURFACE TREAT(SINGLE TREAt TYPE A) 31,830.000 SY TRAFFIC CONTROL 1.000 LS PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 940.000 SF 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 160.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 33,830.000 LF 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 700.000 LF 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 825.000 LF 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 4,260.000 LF 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 45,420.000 LF 4" WHITE BROKEN LINES(GAPS EXCL.)PERM.PVMT.MARKING 60.000 LF 4" WHITE SOLID LINES (PVT. EDGE LINES) PERM.PVMT.MARKING 4,980.000 LF 8" WHITE SOLID LINES PERM.PVMT.MARKINGS 350.000 LF 24" WHITE SOLID LINES (STOP/DIAG LINES)-PERM.PVMT.MARKING 405.000 LF 4" YELLOW SOLID LINES(PVT.EDGE LINES) PERM.PVMT.MARKING 10,050.000 LF PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 286.000 EA