Item 1 — NCDOT Trench Repair This unit price bid item shall include furnishing all traffic control, materials, equipment, and labor for removal, disposal, and replacement of 6-inch ABC at location of WM installation and replacement with 6-inches of base course per procedure identified on Sheet CD-1 of the Engineering Drawings. Payment for NCDOT Trench Repair shall be made by the square yard of pavement installed per NCDOT trench repair details provided in the Drawings. Item 2 — 1.5” Overlay of Asphalt Pavement This unit price bid item includes furnishing all traffic control, materials, equipment, and labor for placement of 1.5” of SF9.5B pavement, where shown on the Engineering Drawings. Payment for asphalt pavement milling shall be made on a separate line item. Payment for the 1.5” pavement overlay shall be made per square yard of asphalt placement per the NCDOT repair detail on Engineering Drawing Sheet CD-1. This line item may also be utilized for payment of additional pavement repair outside the trench area if and where directed by OWASA.