Roof - Contractor shall furnish all labor, permits, transportation, and incidentals necessary to perform the removal and dispose of all roofing materials, replace any damages or decayed roof sheathing, install new roof jacks on all roof penetrations, install new ridge and soffit venting, install ice and water shield or equivalent self-adhering polymer modified bitumen underlayment on 100% of the roof, install new flashing and drip edges (black), extend underlayment 3’ up all roof to vertical wall interfaces and install a minimum of Timberline HDZ or equivalent 25 year architectural class A shingles. Siding - Contractor shall furnish all labor, transportation, and incidentals necessary to perform the removal and dispose of all existing siding and trim, verify and install all shear sheathing as indicated in the provided engineers evaluation, once the sheathing is verified and/or installed per the engineers evaluation, install 1” John Manville foil faced polyiso foam insulation board or equivalent (minimum R-6) over all existing ½” polyiso foam board and sheer sheathing, tape all seams to meet the water resistance barrier requirements of the IRC, properly tape and seal all windows (outy windows replaced within last 10 years), install door and window flashing to accommodate the extended insulation and furring strips, tape all flashing with zip tape, install 1”x4” furring strips around all windows and studs @ 16” O.C. per siding manufactures requirements. Install 8” LP cedar texture 38 series smart siding expert finish pre-painted siding (color tundra grey) and 4” 540 series LP smart siding expert cedar texture finish trim around all windows and openings (color midnight shadow). Replace all facia with 540 series smart siding expert finish cedar texture facia boards (color midnight shadow). Samples of the siding and trim shall be submitted to the Housing Department for approval prior to ordering materials. The 1st floor CMU walls will be furred out with horizontal pressure treated 2”x2” or 2”x4” @ 4’ O.C. and infilled with 1 ½” John Manville foil face polyiso insulation board or equivalent (minimum R-9.3). Install nongalvanized corrugated steel wainscot and flashing over the CMU wall foam board. Install LP 540 series smart siding expert finish 4” cedar texture trim around window (color midnight shadow) and properly flash and tape. Insulation board and wainscot should extend 6” below grade. No additional insulation is needs at the entry door bump outs (entries are not heated). Reinstall or replace all bath fan and dryer duct terminations per code. Paint the exterior entry columns, beams and entry doors to match the trim and facia. The contactor will need to coordinate the removal of all operable exterior cable and internet wiring (will need to work with comcast for installation). The existing wiring that is still in use will need to be reinstalled in a professional manner that is hidden (preferable below the overhang above the CMU basement wall). All satellite dishes will be required to be removed from the building by the tenant(s) prior to construction and will not be allowed to be reattached to the new siding. Install (3) 4”x4” pressure treated posts in the yard for remote wireless satellite dish installations by tenants, if needed. Replace the (3) exterior light fixtures with LED dark sky compliant light fixtures. Work shall be completed as set forth in a contract for this project to be negotiated with the County based upon the contractor’s written proposal.