he Water Services Department wishes to contract with a DP to provide a design for a new headworks facility located within the Westside Treatment Plant located at 1849 Woodswether Road, Kansas City, MO 64105. This Project will comprise of: 1. Project management and management of subcontractors in relation to the work specified herein. 2. Review the Wastewater Master Plan and Westside Facility Plan’s projected supply demands as it becomes available. 3. The design of a new headworks facility of adequate capacity to supply treated water to the Missouri River. 4. Conditional assessments within the existing Westside Treatment Plant. 5. Perform health and safety risk evaluation within the existing Westside Treatment Plant. 6. BIM model updates. 7. Cost effective project phasing. 8. Updates to process and equipment PFD’s and piping and instrumentation diagrams (P&ID’s). 9. Prepare a risk management plan to ensure that continuous site operations will be maintained during construction. 10. DP shall use e-Builder document management system. 11. DP shall use a scheduling system such as Microsoft Project or P6. 12. DP shall provide an S curve with invoice.