The general project scope is to refurbish and upgrade an existing 300+ seat stepped floor teaching Auditorium including but not limited to the following: • Remove & replace fixed seating (portions to be powered) • Remove all finishes, raised stage/floor area, ceilings, lighting, electrical and mechanical devices • Remove walls, motorized projection screen and stage curtains • Demolish portions of interior slab on grade, excavate and form new below floor mechanical return air plenum • Provide new walls, doors, moveable panels, curtains, floor finishes, paint, ceilings (suspended GWB and acoustical clouds), acoustical wall panels. • Provide new electrical devices, lighting, fire alarm devices, panels, new mechanical distribution ductwork and grilles (existing HVAC equipment to remain) • Provide new Audio / Visual Systems • Provide new sprinkler riser from connected building and sprinkler system for this space • Provide new exterior signage Anticipated construction start time is Spring 2025.