Structural And Deck Components • Remove Current Deck and replace New ~18'5"x17' • Rebed all Thru-Hulls Replace Intakes • Rebed all vents, windows, and hatches • Make Lazarette & Hold Water Tight • 4 New Aluminum Deck hatches-Rudder, (2) Laz, Hold • 5 New Aluminum Fuel Fill Hatches and 2 Hydraulic 8”deck hatches • Repair and Glass Rails, Stern Ramp, Cracks, Chips-Superficial • Chafe Mats on Hull-remove fill and replace new • Glass Skeg & Wedges • Soda Blast Hull & bottom-Paint Bottom and Hull Topside • Vinyl Work- Name & State Crest • Paint Aggressive Non-Skid on Deck and Rails Mechanical & Drivetrain • Remove Genset, Purchase & Install new 17kW or greater • Valve adjustment CAT3406E • New Starter & Alternator • Fuel shutoffs/Vents • Recondition Prop and Spare • New Cutlass • Rewrap Mufflers and Exhaust Metal Fab • Remove Gantry’s & Deck Equip, & Mast, soda blast, repair, prime and paint • Remove Center winch, replace with new (Roof Mount) • Fuel Tanks- remove and replace and plumb new ~1200gal • Remove Transducer Box, Fab new smaller unit • Fab Corners for Penboards and checker pen • Corner Guards • New Kickout Plate for Rudder • Repair Skeg Protection Hydraulics • Hydraulic Fluid Flush system/replacement • SS Hard lines in Laz, new hoses, tighten connections • Net Reel Bearing and Seal • New Control Valves on Frame Electrical • LED Lighting Upgrades – Navigation, Deck, Gantry • 4- New 8D Batteries • Furuno 3dFF3D Sonar & 165T-50—200-SS 60 Transducer Purchase and Install • Add Macerator and Emergency Pumps in Lazarette Plumbing • Sanitary & FW Plumbing • New Waste Hold Tank