This project consists of the replacement of dryer equipment at the Elledge Wastewater Treatment Plant, which includes installation of replacement dryer equipment within the Dryer Building, installation of dryer equipment upgrades as part of NFPA 652 compliance and dust hazard analysis (DHA), which generally includes installation of safety improvements and other miscellaneous upgrades to existing and new drying train equipment. This equipment is to be supplied by the Owner (Owner has a Purchase Order Agreement with Andritz) and generally includes replacement of drying train equipment that was damaged. This project also includes demolition and disposal of damaged equipment and materials within the Dryer Building, installation of replacement architectural, structural, mechanical, electrical, and instrumentation and controls components with the Dryer Building and as indicated within the Contract Documents, upgrades to the existing Dryer Building such as demolition of existing cake transfer pump and construction of new shaftless screw conveyors to transport dewatered cake from the Biosolids Dewatering Facility to the Dryer Building, modifications to the existing cake loadout system within the Biosolids Dewatering Facility and Truck Loading Facility, and demolition and removal of existing air compressor system inside the Dryer Building and installation of a new air compressor system.